9 p.m. All safety procedures are in place. We can begin the work.
Let’s say for this outage it was a tree. A 50-foot-tall oak tree fell through the line. It’s off the road, but we got lucky—it broke a crossarm, but the pole is good. The wire isn’t broken either but is currently under the oak tree. We’ve got to chop the tree and free the wire. This will take some time. Anyone who has cut up a downed tree will understand the danger. You have to be careful and pay attention to the tree and how it’s sitting on the ground. Downed trees can shift, and roll while being cut. And here you also have power lines under tension, pinned down by the tree adding an extra layer of danger. Special care and awareness must be used to remove this tree. Sometimes the power lines must be tied down, so that they can be let up in a more controlled manner once the tree is cut. While we work to clear the tree from the line, new material is on the way. We are going to need a crossarm, crossarm braces, new insulators, bolts and ties to tie in the wire.
By this time, the dedicated fiber line technicians responsible for resolving the fiber outage begin gathering the required materials at the yard. They are preparing to head towards the scene of the outage, fully equipped and ready to restore services.
10:30 p.m. The tree has been cleared and the material has arrived.
As I mentioned, the pole is off the road, so that means we can’t get a bucket truck to it. We will have to climb the pole. One of our lineworkers will put on his belt and hooks and climb to the top of the pole. He’ll bring all the tools he’ll need with him. One thing he will take with him is a handline. It’s a rope in a pulley that’s long enough to go from the top of the pole to the ground in a loop. This will be used to lift material and other objects to the lineworker that were too heavy or awkward to take up in his belt. Once he gets to the top of the pole, he will get to work. He’ll start by removing all the broken material. He’ll also inspect the top of the pole for damage we couldn’t see from the ground. Once he has it cleaned up, we will start sending up material on the handline. He should have taken the crossarm bolt with him when he climbed and installed that in the pole. The lineworker on the ground should have already put everything on the crossarm. Next, the lineworker on the ground will tie the crossarm onto the handline in a way that will allow the lineworker on the pole to just guide the arm onto the bolt as it’s being lifted up. Once the new crossarm is on the pole and all the bolts are tightened the wire will be lifted up, also with the handline, and placed on the arm. The wire ties will be sent up, again on the handline, and the lineworker will tie in the wire. After completing all the work in the air, the lineworker will send down the handline and climb down. Once down, he’ll remove his belt and hooks and pack them away. The lineworker on the ground will now be “making up the handline“ which means he is getting it ready to store until it’s needed again. We’ll all carry the tools that we used back to the truck and get them packed away. Lastly, we will remove our grounds.
11:45 p.m. Repairs complete
Now if you still happen to be on your porch, you will see me drive by a third time. This is good news because you are about to get your power restored. I’m heading for the breaker. Once I get to the breaker, I’ll call dispatch and get clearance to re-energize. I’ll let them know who is with me and if they are in the clear. They will check to make sure no one else is working on the line and then give me clearance to try the breaker. At this time, I will close the breaker and your power will be restored. 2001400200
Once the majority of the electrical work has finished, the fiber team is poised to start their work. Fiber techs must wait until electrical repairs are completed to ensure safety and coordination. During this time, managers complete a thorough job briefing, emphasizing the importance of safety procedures for all team members.
12:45 a.m. Power restored, Fiber Internet is on the way
Keep in mind this is just one scenario; not every outage is the same. Each outage varies in time for restoration. This example outage took around five and a half hours to restore. If the tree had broken a pole, it would have been even longer.
As your power flicks on, the fiber techs hang fiber cable in place. This critical step is essential for reconnecting the fiber network and restoring communication services in the affected area.
2:30 a.m. the splicing process begins
The meticulous splicing process is underway. This intricate procedure involves carefully joining individual fiber strands together. It demands precision and attention to detail as each connection is executed.
This moment signifies the turning point for the community members who have been patiently waiting for the restoration of their electrical and fiber services. They can now look forward to going back online and enjoying the benefits of these vital utilities.
3:30 a.m. Lineworkers and fiber technicians return home, safe and sound.
We work for you, our neighbors, not just as electrical linemen but also as fiber technicians who ensure that your electric and internet services are up and running smoothly.
We’ve become so dependent on electricity and high-speed internet that every outage, whether it is a short outage or an extended one, can be stressful for those without power or internet connectivity. The longer outages last, the more stressful and irritating it can become, especially when you rely on the internet for work, education or communication. I hope that I’ve provided a better understanding of the restoration process so you have an idea of what’s happening while you wait. Just know that your co-op line and fiber crews are doing their best to get the lights and internet back on as quickly and safely as possible.
OEC and its employees are not only members of your community but also dedicated individuals who understand the importance of uninterrupted power and internet services. We live in the same neighborhoods, shop at the same stores, and send our kids to the same schools. If your lights are off or your internet is down, there is a good chance ours are affected too.
We will always be committed to serving our members and communities by providing safe and reliable electricity and internet connectivity—24 hours a day, 7 days a week, 365 days a year.